History & science of lead in American water infrastructure

Lead pipes have been part of American water systems for over 150 years. Understanding the history explains why they’re still there.

Throughout the 19th and early 20th centuries, lead pipes, lead solder, and lead service lines were widely installed across the United States because lead was considered durable and suitable for transporting water. At the time, the serious health effects of low-level lead exposure were not yet fully understood. Although scientific knowledge and plumbing standards have since advanced, many of these legacy materials remain in older infrastructure today. Where aging pipes or soldered joints may still be present, building water lead testing for Brooklyn properties can help assess drinking water quality and determine whether further investigation is needed.

0 M
Estimated lead service lines remaining in US (2024)
0
Year lead solder was banned in new residential plumbing
0
First Lead and Copper Rule promulgated by EPA
0
LCRR target for full lead service line replacement
Historical Timeline

How American water infrastructure acquired its lead problem

1820s–1880s

Lead pipes adopted as the standard for urban water systems

As American cities built their first centralized water systems, lead was the dominant pipe material for service connections and distribution for a simple reason: it was workable, durable, and resistant to corrosion by most soils. Roman precedent reinforced its reputation. Boston, New York, and Philadelphia installed lead service lines as their systems expanded. The word “plumber” derives from “plumbum,” the Latin for lead.

1900–1940

Lead remains standard; galvanized and cast iron emerge as alternatives

By 1900, approximately 70% of American cities with populations over 30,000 used lead service pipes. Industry manuals published by lead pipe manufacturers specifically marketed lead for domestic service connections, citing ease of installation. Galvanized steel emerged as a cheaper alternative in the 1920s and 1930s, gradually replacing lead for interior building plumbing though not for service line connections.

1945–1960

Lead solder becomes standard in copper plumbing as copper adoption grows

As copper replaced galvanized steel for interior building plumbing in the post-war construction boom, 50/50 lead-tin solder became standard for joining copper pipe. The lead content of the solder was approximately 50% by weight. Every joint in every copper plumbing system installed during this period contained this solder. The quantity was small compared to lead service lines, but the surface area in contact with drinking water was significant at every joint.

ADVERTISEMENT

1974

Safe Drinking Water Act establishes framework for regulating contaminants

The SDWA gave EPA authority to set maximum contaminant levels for drinking water. Lead was not initially regulated under a specific rule; it was addressed through general corrosion control requirements. The infrastructure legacy — decades of lead pipes already installed — was not directly addressed by early SDWA regulations.

1986

SDWA Amendment bans lead solder and lead pipes in new plumbing

The 1986 SDWA Amendments prohibited the use of solder or flux with more than 0.2% lead in new plumbing, and required that pipe, fittings, and fixtures used in public water systems or connected thereto be “lead free” defined as no more than 8% lead in solder and flux and no more than 0.2% in pipe and fittings. This stopped new installation but did not require replacement of existing lead infrastructure.

1991

First Lead and Copper Rule establishes action level and corrosion control requirements

EPA’s Lead and Copper Rule set the 15 ppb action level and required utilities exceeding it to implement corrosion control treatment, public education, and, ultimately, lead service line replacement. The rule was the first federal regulatory mechanism specifically addressing lead in drinking water at the household level.

2021

Lead and Copper Rule Revisions mandate full service line inventory and accelerated replacement

The LCRR lowered the lead trigger level to 10 ppb, required utilities to complete inventories of all service lines by October 2024, mandated 3% per year replacement of identified lead service lines, and set a framework for full replacement by 2031. The 2022 Infrastructure Investment and Jobs Act provided $15 billion in dedicated funding for LSL replacement nationally.

Pipe Materials by Era

What was installed when — and what it means currently

Lead service line

Underground connection from street main to building. Still present in millions of properties. Primary regulatory replacement focus.

Galvanized steel

Building risers and branch lines. Does not leach lead but corrodes to release iron. Discoloration (rust) common in older buildings with original galvanized supply.

Copper with lead solder

Modern-looking copper pipe with 50/50 lead-tin solder at every joint. Cannot be distinguished from post-1986 copper by appearance. Requires testing to identify lead contribution.

Copper (lead-free solder)

Required to use solder with <0.2% lead. Post-2014 fixtures also must meet stricter “lead free” definition (<0.25% weighted average). Lowest lead risk from internal plumbing.

NYC & NJ Specific

What the lead pipe situation looks like in the New York metro area

NYC: ~16,000 lead service lines estimated remaining

NYC DEP has conducted significant lead service line replacement over decades. The current estimate of approximately 16,000 remaining LSLs is a fraction of the 1980s inventory. DEP’s orthophosphate corrosion control program significantly reduces lead dissolution from remaining LSLs and from interior building lead solder.

NJ: ~350,000–400,000 LSLs with 2031 replacement mandate

New Jersey has one of the highest remaining lead service line counts of any state, concentrated in older cities including Newark, Trenton, Camden, and Jersey City. The state mandated full replacement by 2031 and provided state funding mechanisms. Newark completed full LSL replacement in 2021 ahead of schedule.

The Material Science

Why lead was the preferred pipe material for over a century — and what replaced it

Lead (Pb) as pipe material

Lead’s use in plumbing spans 2,000 years — the Latin word for lead, plumbum, is the root of “plumbing.” It was preferred for water supply because it is extremely malleable (easily formed into pipes), corrosion-resistant to the visible eye, and solderable. Its health effects were not unknown to the ancient world — Roman engineers documented lead poisoning — but this knowledge was not applied to water system design for most of human history.

The copper transition

Copper pipe displaced lead as the primary supply material in American construction during the mid-20th century, primarily due to cost dynamics and copper’s superior pressure resistance. But copper joints required solder — and the solder formulated to bond copper most effectively was 50/50 lead-tin, which remained standard until it was banned in 1986. Copper pipe with lead solder is the most common source of residential lead exposure in buildings constructed 1950–1986.
 

Modern alternatives

PEX (cross-linked polyethylene) has become the dominant residential supply material in new construction since the 1990s because it requires no solder, is flexible, freeze-resistant, and does not corrode. CPVC is another non-metallic alternative. Both eliminate lead-solder risk entirely. Lead-free solder (maximum 0.2% lead by weight per SDWA definition) is now required for all new plumbing — though some formulations contain antimony, which has its own considerations.
NYC & NJ Infrastructure

What the lead pipe landscape actually looks like in the NYC-NJ metro area

New York City

Estimated LSLs remaining ~16,000
Pre-1986 buildings (lead solder) Majority of stock
System lead action level status Compliant
Corrosion control treatment Orthophosphate

The important distinction: NYC’s system-level lead compliance does not characterize individual buildings. A system-wide 90th percentile of 3.2 ppb does not mean all buildings test below this. Pre-1986 buildings with children warrant individual testing.

New Jersey

Estimated LSLs statewide ~350,000–400,000
State replacement mandate Full replacement by 2031
Most affected systems Passaic, Newark, Trenton
Newark: replacement status Complete (2021)

Newark as a precedent: Newark completed full LSL replacement in approximately 18 months by treating it as an emergency and securing state and federal funding. This demonstrates that the 3%/year federal pace is a floor, not a ceiling — significantly faster replacement is achievable with political will and resources.

0 yrs
Lead’s history in water supply infrastructure — plumbum to plumbing
$ 0 B
Estimated national cost of full lead service line replacement across all U.S. water systems
$ 0 B
Bipartisan Infrastructure Law allocation specifically for lead service line replacement through state SRFs
0
The MCLG for lead in drinking water — the EPA’s own health goal acknowledges no safe level exists